With the introduction of the new Guyson Marr-Line 1000/3 conveyorised wash and dry system, even larger, reusable tote bins and trays can now be thoroughly cleaned and dried, getting rid of production stains, oils, contaminants, and odours. This leads to improvements in quality assurance; protection of components and all importantly minimises cross contamination from one usage of the tote bin to the next.
The largest machine in the range is now the Marr-Line 1000/3, a three-stage washing and drying system specially built to process a range of plastic tote bins, up to a maximum of 100cm wide by 50cm high.