Control module for generator sets - CON-2012

Control module for generator sets - CON-2012
ELECTRA MOLINS Sometimes due to the design or to the installation complexity, or if the load transfer switchboard is placed far away from the genset room, it is advisable that the load transfer is controlled separately and independently from the genset control equipment.

In these cases, the solution is the CON-2012 equipment.The genset control equipment will be on these occassions the AUT-MP12DR.

This equipment is also suitable for controlling load transfers with motorised automatic circuit breakers, or for installations with more than one load transfer that require an independent control of each one.

Sometimes where high performances are required for the load transfer control, this equipment will fulfill it.

Mains supply control is carried out by the CON-2012 load transfer control module by means of a three-phase detection of mains failure by minimum voltage, maximum voltage, unbalance among the phases and repetitive microcuts, and gives the genset starting signal.

The equipment can be configured to control any kind of switching: two contactors, one motorized switch or two motorised automatic breakers.

A 5.7" colour TFT screen provides a display of the load transfer switch operating status, electrical measurements, alarms, events and harmonics analysis. Push-buttons in the frontal panel permit the display of the other screens for expanded information.

The electrical measurements displayed, for both genset and mains, are the same detailed for the AUT-MP12 module.

The CON-2012 equipment checks that all the manoeuvres switching commands were successful. Otherwise shows the corresponding alarm.

The harmonics analysis can be performed for mains and genset (for voltage and current).